  • 产品导入/image/gNtMNN8NT4OY1-td0qpVLQ.png

Number:

1304374196351684608

Three-level lifting and traversing

Retail Price

¥ 0

Market price

¥ 0


Weight

0

Quantity
-
+

Inventory

0

隐藏域元素占位

Three-level lifting and traversing

Classification:

PSH lifting and traversing class

Return to List
  • Product description
    product manual:
    Three-level lifting and traversing parking equipment, one layer only for traverse movement, the second layer is both traversing and lifting, and the third floor is only for lifting movement; each parking space has a loading platform, and one or two floors have traverse space; When accessing the vehicle, the second and third floor vehicles will be lifted to a ground level, and the second and third floor vehicles will be traversed by a layer of vehicle to leave a space, and the second and third floor vehicles will be lowered to a ground driver. Enter the garage, access the vehicle, and complete the access process. Vehicles parked on the first floor of the car can access the garage directly.
     
    Product physical map:
    Product Structure:
    Product parameters:
    Model project

    Small car
    (Xtype)

    Medium car
    (Ztype)

    Large car
    (Dtype)

    Extra large car
    (Ttype)

    Car size

    Car length(mm)

    4400

    4700

    5000

    5300

    Car width(mm)

    1750

    1800

    1850

    1900

    Car height(mm)

    1450

    1450

    1550

    1550

    Car weight(kg)

    2000

    2000

    2000

    2300

    Equipment size

    Column width WP(mm)

    2400

    2450

    2500

    2550

    Full width L(mm)

    WP*3+260

    Pitch A(mm)

    5400

    5700

    6000

    6300

    Full length B(mm)

    A+260

    Drive unit

    the way

    Motor + chain

    power supply

    Three-phase AC 380V 50Hz

    Lifting motor

    2.2KW

    Traverse motor

    0.2KW

    Lifting speed

    4~5m/min

    Traverse speed

    7~8m/min

    control method

    Programmable controller (PLC)

    Parking, operation

    Reversing into the warehouse, moving out of the library; IC card or touch screen operation

    Civil construction requirements

    Ground flatness ± 5mm; add pre-buried board.